Vineyards

Total Grapes Harvested in all Vineyards:

  • 2000:        8 tonnes
  • 2001:    150 tonnes
  • 2002:    918 tonnes
  • 2003:    769 tonnes
  • 2004:  1456 tonnes
  • 2005 : 1340 tonnes
  • 2006 : 1732 tonnes
  • 2007 : 1814 tonnes
  • 2008 : 2703 tonnes
  • 2009 : 2189 tonnes
  • 2010 : 2583 tonnes
  • 2011 : 3585 tonnes
  • 2012 : 3211 tonnes
  • 2013 : 3818 tonnes
  • 2014 : 4196 tonnes
  • 2015 : 3882 tonnes
  • 2016 : 4693 tonnes
  • 2017 : 4141 tonnes
  • 2018 : 4441 tonnes
  • 2019 : 3256 tonnes
  • 2020 : 4230 tonnes
  • 2021 : 3212 tonnes
  • 2022 : 5633 tonnes
  • 2023 : 5226 tonnes

Keltern Vineyard

Location: State Highway 50, Hawkes Bay

Planted Area : 47.70 hectares

Varieties once in full production:

* Chardonnay 40.97ha
* Pinot Gris 6.73ha
 

Grapes Harvested:

  • 2000:     8 tonnes
  • 2001: 108 tonnes
  • 2002: 356 tonnes
  • 2003: 136 tonnes
  • 2004: 392 tonnes
  • 2005: 530 tonnes
  • 2006: 287 tonnes
  • 2007: 454 tonnes
  • 2008: 362 tonnes
  • 2009: 409 tonnes
  • 2010: 219 tonnes
  • 2011: 285 tonnes
  • 2012: 242 tonnes
  • 2013: 323 tonnes
  • 2014: 372 tonnes
  • 2015: 248 tonnes
  • 2016: 347 tonnes
  • 2017: 319 tonnes
  • 2018: 386 tonnes
  • 2019: 322 tonnes
  • 2020: 371 tonnes
  • 2021: 276 tonnes
  • 2022: 453 tonnes
  • 2023: 485 tonnes

NB. The 2003 harvest was dramatically affected by the October 2002 Hawkes Bay frost. Since then a major frost protection system has been installed at Keltern, and paid for itself within two years.

The Keltern vineyard was under redevelopment during 2012-2014 and half of the total vineyard was replanted with the high performing chardonnay variety.

Twyford Gravels Vineyard

 

Click here to enlarge

Location: State Highway 50, Hawkes Bay

Area: 17.19 hectares

Varieties when fully cropping:

* Merlot 9.09ha
* Cabernet Sauvignon 1.36ha
* Syrah 6.74ha

Grapes Harvested:

  • 2002:   35 tonnes
  • 2003:   48 tonnes
  • 2004: 110 tonnes
  • 2005: 167 tonnes
  • 2006: 120 tonnes
  • 2007: 148 tonnes
  • 2008: 132 tonnes
  • 2009: 132 tonnes
  • 2010: 101 tonnes
  • 2011:   68 tonnes
  • 2012:   58 tonnes
  • 2013:   77 tonnes
  • 2014: 119 tonnes
  • 2015: 105 tonnes
  • 2016:   83 tonnes
  • 2017:   67 tonnes
  • 2018:   85 tonnes
  • 2019:   91 tonnes
  • 2020: 147 tonnes
  • 2021: 137 tonnes
  • 2022: 171 tonnes
  • 2023: 155 tonnes

Taylors Pass Vineyard

 

Click here to enlarge

Location: 683 Awatere Rd, Awatere Valley

Area: 73.4 hectares

Varieties:

* Sauvignon Blanc 52.13ha
* Riesling 5.70ha
* Pinot Noir 6.03ha
* Pinot Gris 4.52ha
* Chardonnay 4.98ha

Grapes Harvested:

  • 2001:     41 tonnes
  • 2002:   527 tonnes
  • 2003:   585 tonnes
  • 2004:   954 tonnes
  • 2005:   643 tonnes
  • 2006:   767 tonnes
  • 2007:   591 tonnes
  • 2008: 1049 tonnes
  • 2009:   726 tonnes
  • 2010:   801 tonnes
  • 2011:   896 tonnes
  • 2012:   695 tonnes
  • 2013:   806 tonnes
  • 2014:   924 tonnes
  • 2015:   767 tonnes
  • 2016: 1108 tonnes
  • 2017:   820 tonnes
  • 2018: 1071 tonnes
  • 2019:   707 tonnes
  • 2020:   794 tonnes
  • 2021:   674 tonnes
  • 2022: 1057 tonnes
  • 2023: 1093 tonnes  

 


Seddon Vineyard

Seddon Vineyards is situated on the southern banks of the Awatere river about 40 minutes drive south of Blenhiem. The vineyard has been incorporated into a dramatic landscape, made up of 3 river terraces bound by the Inland Kaikoura ranges on its southern flanks and the Wither hills to the north.

Location: Marama Road, Seddon

Area: 224.82 ha plus the Middlemiss development 62.09 ha (20.18 ha Pinot Noir, 41.92ha Sauvignon Blanc)

Varieties:

* Sauvignon Blanc 155.89ha
* Riesling 10.75ha
* Pinot Noir 29.00ha
* Pinot Gris 27.97ha
* Chardonnay 1.21ha

Grapes Harvested:

  • 2001:   411 tonnes
  • 2002:   662 tonnes
  • 2003:   442 tonnes
  • 2004:   901 tonnes
  • 2005:   500 tonnes
  • 2006:   558 tonnes
  • 2007:   621 tonnes
  • 2008: 1160 tonnes (Higgins Rd vineyard commenced production)
  • 2009:   922 tonnes
  • 2010: 1462 tonnes
  • 2011: 2336 tonnes
  • 2012: 2216 tonnes
  • 2013: 2612 tonnes
  • 2014: 2781 tonnes
  • 2015: 2762 tonnes
  • 2016: 3154 tonnes
  • 2017: 2936 tonnes
  • 2018: 2836 tonnes
  • 2019: 2155 tonnes
  • 2020: 2918 tonnes
  • 2021: 2125 tonnes
  • 2022: 3761 tonnes (Middlemiss development commenced production 62.09ha)
  • 2023: 3493 tonnes

 

Latest News